Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Almazkoor, F B (2014) Two-stage methodology for managing and controlling material flow between multiple construction projects, Unpublished PhD Thesis, , Clemson University.

Altayeb, S A (1990) Drug testing and its impact on the incident rate in the construction industry, Unpublished PhD Thesis, , Clemson University.

Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management, Unpublished PhD Thesis, , Clemson University.

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools, Unpublished PhD Thesis, , Clemson University.

Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education, Unpublished PhD Thesis, , Clemson University.

George, R (2007) Information flow to support front end planning, Unpublished PhD Thesis, , Clemson University.

Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors, Unpublished PhD Thesis, , Clemson University.

Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions, Unpublished PhD Thesis, , Clemson University.

Nikyema, G A B (2020) Barriers to the adoption of green building materials and technologies in developing countries: The case of Burkina Faso, Unpublished PhD Thesis, , Clemson University.

Plumblee, J M, II (2013) Incorporating natural hazard resistance into the life cycle assessment framework, Unpublished PhD Thesis, , Clemson University.

Prince, J R (2004) Evaluating the impact of onsite design on project performance, Unpublished PhD Thesis, , Clemson University.

Rockow, Z R (2020) Qualitative & quantitative analyses of existing buildings’ adaptability, Unpublished PhD Thesis, , Clemson University.

  • Type: Thesis
  • Keywords: sustainability; new build; building design; reuse; designer; owner; thematic analysis; case study
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2449441492
  • Abstract:
    In order to promote resiliency and sustainability, there is a benefit to making buildings more adaptable. Adaptable buildings are believed to be more likely to be modified, changed, or reused instead of being demolished. The research goals revolved around understanding what features, if any, can be implemented during the design phase to make a building more adaptable in the future. Three objectives were included for this research: 1. Compare qualitative data from real-world adaptation projects with Design for Adaptability (DfA) strategies reported in the literature. 2. Create a model for quantifying the “openness” of floorplans. 3. Measure the relationship (if any) between design-based adaptability (DBA), building condition (BC), historical/sentimental value (HS) and adapt/demo outcomes. This objective tests the null-hypothesis that HS, BC, or DBA are not significant predictors for the demolition and adaptation outcome of projects. The research presented in objective one was conducted to answer the question: Do empirical data from real-world projects align with the Design for Adaptability (DfA) strategies reported in the literature? To answer this question, a Thematic Analysis was used to evaluate qualitative data from 89 building adaptation projects. The research evidence suggests that when DfA strategies are present in a building design (intentionally or otherwise), they facilitate adaptation. Similarly, when the strategies are not present, the adaptation project is impeded. This research provides empirical support for implementing DfA strategies into new building designs. The second objective was the creation of the Areal Openness Model (AOM) to answer the question “how open is open in adaptable floor plans”, partly motivated by the link between openness and adaptability. Case study comparisons are presented to show proof of concept evaluation of AOM with adapted and demolished buildings. The proposed AOM provides a means of quantitatively measuring openness as it relates to adaptability. Future potential is for designers and owners to use the model to evaluate building design alternatives with respect to adaptability. The third objective was to measure the relationship (if any) between historical/sentimental status (HS), building condition (BC), and design-based adaptability (DBA) and adapt/demo outcomes. A quantitative assessment of demolished and adapted buildings was conducted using a logistic regression model of 88 projects that are either adapted or demolished. The assessment was particularly focused on evaluating the impact of design-based adaptability on adapt/demo outcomes. The research reveals that the historical and sentimental status of the building is statistically significant to the outcome of adaptation. Building condition and design-based adaptability are also positively related to adaption outcomes but not to a statistically significant level.

Shealy, E W, III (2015) Decision environments to encourage more sustainable infrastructure outcomes, Unpublished PhD Thesis, , Clemson University.

Skipper, C O (2004) An analysis of leadership behaviors in the construction industry: Identification of influences that develop top performing project managers and engineers, Unpublished PhD Thesis, , Clemson University.

Valdes-Vasquez, R (2011) Social sustainability considerations during planning and design: A framework of processes for construction projects, Unpublished PhD Thesis, , Clemson University.